Machine Hour Cost Calculator
Calculate fully burdened machine hourly rates ($/hour) combining capital depreciation, preventive maintenance, electricity, tooling, and operator wages.
Machinery & Spindle Hourly Cost Audit
Machine Hourly Rate Formula
Machine Hourly Rate = (Annual Depreciation + Maintenance + Power + Tooling + Facility) ÷ Operating Hours + Operator Wage- Capital Depreciation: Annual asset depreciation write-down per operating hour.
- Consumables & Tooling: End mills, inserts, coolant, lubricants, filters, and wear plates.
- Unburdened vs Burdened: Rate without operator vs fully staffed hourly billing rate.
Step-by-Step Worked Example
Calculation Steps:
- Depreciation & Facility = ($25,000 + $2,000) / 2,000 = $13.50 / hr
- Maintenance = $8,000 / 2,000 = $4.00 / hr
- Electricity = $12,000 / 2,000 = $6.00 / hr
- Tooling = $5,000 / 2,000 = $2.50 / hr
- Unburdened Machine Rate = $13.50 + $4.00 + $6.00 + $2.50 = $26.00 / hr
- Fully Burdened Rate (With Operator) = $26.00 + $28.00 = $54.00 / hr
How to Use This Calculator
- 1Enter annual capital depreciation and plant facility/insurance allocations.
- 2Input annual maintenance, electricity, and tooling budgets.
- 3Enter total machine operating spindle hours per year.
- 4Add dedicated operator hourly wage to view fully burdened rates.
Assumptions & Limitations
- Annual hours reflect actual cutting or running spindle time, not calendar availability.
- Tooling and coolant wear scales proportionally with run hours.
Frequently Asked Questions
What is the difference between unburdened and burdened machine hour rates?
The unburdened rate covers purely the physical machine (depreciation, power, maintenance, and tooling). The fully burdened rate includes the operator wages and payroll overhead required to run it.
Related Cost Calculators
Machinery Operating Cost Calculator
Calculate machinery running expenses for specific production jobs based on spindle power draw, wear parts, tooling coolant, and cycle times.
Equipment Depreciation Calculator
Calculate manufacturing equipment depreciation schedules using Straight-Line, Double-Declining Balance, or Units-of-Production accounting methods.
Manufacturing Electricity Cost Calculator
Calculate plant electricity expenses for 3-phase industrial machinery, including energy consumption (kWh) and utility peak demand charges ($/kW).